Last checked against M.G.L. c.111 ss.197 and 197A and Mass.gov on November 24, 2026

Short answer: if the home was built before 1978, give the official Tenant Lead Law Notification and Certification form — and any existing inspection report, Letter of Full Compliance, or Letter of Interim Control — before the tenant signs. That is required even if no child will live there. If a child under 6 does live there, or will, you must have dangerous lead paint abated or contained so the unit is in compliance. You may not refuse to rent, or evict, because of lead paint. c.111 ss.197, 197A; Mass.gov Lead Law and Tenant Notification pages

FreeNo sign-upRuns in your browserChecked November 24, 2026

Check what applies to this unit ↓

Massachusetts has its own Lead Law on top of federal disclosure rules. The notification step happens at every new tenancy in a pre-1978 home. The deleading duty is triggered by a child under 6 in the home, including a single-family that the owner lives in.

What applies to this unit?

Notification, before the lease is signed

Under state and federal law, the owner of a home built before 1978 must give a prospective tenant these documents before entering a rental agreement, whether or not a child under 6 will live there c.111 s.197A(d); Mass.gov Tenant Lead Law Notification:

Check the state's Lead Safe Homes databases for prior inspection history before you rent. If a prospective tenant will not sign the certification, the regulations allow the owner to check the box stating that the documents were provided and the tenant refused to sign 105 CMR 460.725(B).

An owner who fails to comply with the notification statute is liable for all damages caused by that failure and for a civil penalty of up to $1,000. A violation by a person engaged in trade or commerce is also an unfair or deceptive act under G.L. c.93A c.111 s.197A(e). Mass.gov adds that federal law has its own civil and criminal penalties; we have not restated those dollar amounts here.

When a child under 6 lives in the home

The Lead Law requires the removal or covering of lead paint hazards in homes built before 1978 where any child under 6 lives. Owners of rental property and owners living in their own single-family home are both responsible c.111 s.197; Mass.gov Lead Law page.

  1. Hire a licensed lead inspector to test the home and record the hazards.
  2. Have deleading work done by a trained and licensed person. Some low- and moderate-risk tasks may be done by an owner or agent only after the inspection and after that person is trained and authorized. The Childhood Lead Poisoning Prevention Program (CLPPP) can tell you which tasks those are: (800) 532-9571.
  3. A licensed inspector reinspects. If the unit passes, you receive a Letter of Full Compliance.

Interim control is a temporary option. A licensed risk assessor identifies urgent hazards (loose or peeling lead paint, lead-dust windows, high lead dust, hard-to-clean window wells, and leaks that are causing lead paint to peel). After that work is done and the assessor confirms it, you receive a Letter of Interim Control, good for one year and renewable for one more year after a reinspection — two years maximum. By the end of those two years, if a child under 6 lives there, the home must be brought to full compliance, even if the property has been sold Mass.gov interim-control page.

When a pre-1978 home with dangerous levels of lead changes ownership and a child under 6 will become or remain a resident, the new owner generally has 90 days to contain or abate and come into compliance, with a limited exception in s.197D c.111 s.197(a).

Fair housing and liability

You cannot evict, or refuse to rent to anyone, because of lead paint. Mass.gov states that discrimination is against the law and carries penalties, and refers questions to the Massachusetts Commission Against Discrimination.

If a child is lead-poisoned from lead hazards in the home where the child lives, Mass.gov states that you are legally responsible, and that a tenant waiver does not avoid that liability. Complying with the Lead Law is the protection the state describes.

Tax credit and other financial help

Massachusetts offers a personal income-tax credit for owners who pay to delead residential property in the state (it does not have to be a principal residence). Per the Department of Revenue (page updated March 10, 2026) and the CLPPP financial-assistance page:

Grants and loans also exist, including LeadSafe Massachusetts, the Get the Lead Out loan program, and some city programs (Boston's among them). Eligibility and amounts change. Start at the official financial assistance page.

This is general information, not legal advice. Lead work is regulated; do not start deleading without the right license or authorization. If you are unsure about a unit's year of construction or its compliance letters, check Lead Safe Homes and contact CLPPP at (800) 532-9571 or (617) 624-5757 before you rent.

Related guides

Common questions

Do I have to give the lead notification if no child will live in the unit?

Yes, if the home was built before 1978. Mass.gov states that state and federal tenant-notification rules apply whether or not a child under 6 will live there. The duty to delead or obtain interim control is a separate requirement that applies when a child under 6 resides in the home.

Can I refuse to rent to a family with a child under 6 because of lead paint?

No. Mass.gov states that you cannot evict or refuse to rent to anyone because of lead paint, and that discrimination is against the law and carries penalties. For discrimination questions, Mass.gov points landlords to the Massachusetts Commission Against Discrimination.

Can a tenant sign a waiver saying they accept the lead paint?

No. Mass.gov states that an owner cannot avoid liability by asking tenants to sign an agreement that they accept the presence of lead paint. Complying with the Lead Law is the protection the state describes.

How long does a Letter of Interim Control last?

It is good for one year and may be renewed for one additional year after a reinspection. You can hold interim control for a maximum of two years. By the end of those two years, if a child under 6 lives there, the home must be brought to full compliance, even if the property has been sold (Mass.gov interim-control page).